Pemba processing site with leaching tanks and the Uluguru foothills behind

Mvomero District  ·  Morogoro Region, Tanzania

Licensed gold mining in the Uluguru highlands.

Pemba Gold Mine Company Limited holds 26 Primary Mining Licences, runs an operating leaching plant and has sold gold through licensed channels since 2024.

Licences
26 Primary Mining Licences
Legal basis
Mining Act 2017
Verified sales
216.31 oz, 2024–2026
Location
60 km north of Morogoro town

The company

One licensed operation, from survey to bullion.

Pemba Gold Mine Company Limited (PGMCL) operates at Pemba Village, Kibati Area, Mvomero District, on the paved Morogoro–Dar es Salaam corridor.

The site is 60 km north of Morogoro town and 300 km west of the Dar es Salaam port. The company holds 26 Primary Mining Licences under the Mining Act 2017, all in good standing, over contiguous ground served by a single set of infrastructure.

We cover the whole chain in-house: geological survey and soil sampling, open-cast extraction, refining and separation of gold from ore and stockpiles, and sale of the finished gold.

Production record

Confirmed in writing by the Mining Commission.

216.31 oz
Gold sold, 2024–2026
80
Documented batches
TZS 114.6 m
Royalties and inspection fees paid
26
Primary Mining Licences held

Source: Mining Commission, Resident Mines Office Morogoro, ref. HA.228/258/602/58, 28 May 2026.

Operations

Six lines of business, one integrated operation.

  1. 01

    Gold exploration

    Geological surveys and soil sampling to identify gold-rich areas before any ground is opened.

  2. 02

    Open-cast mining

    Removal of gold-bearing material from licensed mining sites.

  3. 03

    Mineral processing

    Refining and separating gold from ore and stockpiles.

  4. 04

    Gold supply and trading

    Preparing extracted gold for sale in local and international markets.

  5. 05

    Mining licence management

    Operating legally under Primary Mining Licences (PMLs).

  6. 06

    Mining investment opportunities

    Partnerships and investor participation in mining projects.

On site

Infrastructure that is already built.

Road, power, workforce and a working plant are in place, so new capital goes into ground rather than groundwork.

  • TANESCO grid power connected to site
  • All-weather road access
  • Site clearance completed
  • Resident workforce
  • Operating leaching plant
  • Laboratory and shared management

Development

Three tracks across 26 licences.

  1. Track 1

    Joint venture

    10 PMLs

    Investment and technical services agreement signed 13 September 2025, 20-year term. A 200 tpd carbon-in-pulp (CIP) plant is due to complete at the end of September 2026.

  2. Track 2

    Second project

    6 PMLs

    Wholly Pemba. A bank loan has been approved to fund a 300 tpd CIP plant and treatment of a 70,000-tonne surface stockpile.

  3. Track 3

    Joint venture offered

    10 PMLs

    Permitted and surveyed. Open to an incoming partner contributing USD 4–8 million of development capital.

The three tracks are funded separately but share the road, grid connection, laboratory, management and workforce.

Where we work

Ground shaped by mountains.

The property lies in the Proterozoic Usagaran Belt, on the eastern margin of the Tanzania Craton, in the foothills of the Uluguru range.

Gold in this belt occurs in steeply dipping shear zones within migmatitic gneiss. Our mark reflects the setting: the M in the Pemba wordmark is drawn as a mountain, tying the company to its location and to the mineral resources beneath it.

  • District Mvomero, Morogoro Region
  • Access Paved Morogoro–Dar es Salaam corridor
  • Geology Usagaran Belt, shear-hosted gold

Investment

Joint venture invitation: 10 Primary Mining Licences.

We invite a partner into 10 of our 26 licences, alongside an operator that is already funded, permitted and building.

Licences offered
10 PMLs of 26 held
Capital sought
USD 4–8 million
Structure
Joint venture, terms open
Company contributes
Licences, infrastructure, team
Partner contributes
Development capital
Capital range set by
Processing route chosen

Capital funds resource-definition drilling first, with the aim of a classified resource within 12–18 months of closing. Ore can then be treated by toll at the second project’s plant, or through a dedicated plant on the same pattern. Equity in a ring-fenced joint venture company, a staged earn-in or production sharing will all be considered.

Classification status

The company holds no mineral resource or ore reserve classified under JORC 2012, NI 43-101 or an equivalent code over any part of the property, and makes no such claim. Geophysical work has defined exploration targets only. A partner is funding the conversion of targets into a classified resource and should price that risk accordingly.

A site visit is invited, and a data room is available: Mining Commission production report, geophysical technical report, bank facility documentation, licence register and audited financial statements.

Request the investor pack

Contact

Speak with our team.

Tell us who you are and what you are looking for. We reply to investor, partnership and trading enquiries directly.

Contact
Maximilian Robert Makori
Managing Director
Contact
Musa Solomon
Director, Finance and Administration
+255 767 488 311
Site
Pemba Village, Kibati Area, Mvomero District, Morogoro Region
Post
P.O. Box 71427, Dar es Salaam